Skipping a required HDB permit is one of the more expensive mistakes a homeowner can make, since it can mean undoing completed work. Here's a rundown of what actually needs sign-off first.
Demolishing or altering any wall
Every wall change needs HDB approval beforehand, whether it's a non-load-bearing concrete wall, a drywall, or a hollow partition. Demolishing a concrete wall specifically needs to be overseen by a professional engineer, not just a contractor.
Topping up or replacing flooring in dry areas
Levelling with cement screed, or laying new tile or timber flooring, both need a permit. Surface-only finishes like vinyl, carpet, or linoleum are the exception and don't require one.
Bathroom wall and floor work
Within the first three years of a flat's life, this kind of replacement is restricted to protect existing warranties. After the three-year mark, hacking work is allowed but still needs a permit under specific guidelines.
Renovating a purchased recess area
If you've bought the recess area attached to a corner unit, permanent modifications there still need a permit, since the space technically remains communal despite the private purchase.
Replacing the main door, windows, or relocating internal doors
A new main door has to be one of HDB's approved fire-rated options. Moving an internal door needs a permit and can't involve breaching a reinforced concrete wall. Any window installation or replacement needs a permit as well.
Certain electrical work
All electrical work needs a licensed electrician, full stop. In older flats that haven't gone through the Home Improvement Programme, adding new power points or isolators needs a permit, and a permit is also what allows a higher-capacity electrical setup for things like air-conditioning.
Fish tanks or ponds
There are real weight and size limits here: a tank-and-rack system caps out at 150kg total and 600kg per room, and a pond can't exceed 2m by 1m in surface area at more than 0.5m deep. Anything beyond those limits needs its own specific application.
Staircase work, for executive maisonettes
In the rarer two-storey HDB units, replacing railings or adding safety barriers where a drop exceeds 1m requires a permit.
Installing an awning, for top-floor units
For units with an open-to-sky balcony on the top floor, an awning needs both a professional engineering design and HDB approval before installation.
How to actually apply
Most interior designers will walk you through this process as a matter of course. The application itself needs the official HDB permit form along with your floor plans. Approval typically takes about three months for a new BTO and around one month for a resale flat.

